Deep Hole Drilling Precision and Quality

Plan bore quality inspection by characteristic, depth coverage, measurement method and uncertainty before deciding acceptance.

13 articles

A diameter result answers one question

A bore inspection plan needs more than a space for a diameter number. Start by naming the drawing characteristic and the locations at which it must be evaluated. Our editorial distinction is between size, form or position, surface texture and local defects: record the evidence for each requirement rather than treating one result as a substitute for the others.

Bore inspection planning diagram: requirement, covered locations, measurement and uncertainty, then documented disposition.

Editorial planning diagram. Locations are illustrative, not a prescribed sampling plan.

The JCGM Guide to the Expression of Uncertainty in Measurement, sections 3.1.1–3.1.3, begins measurement with a defined measurand, method and procedure and associates the result with uncertainty. Section 3.3.2 discusses contributions including incomplete definition and non-representative sampling. This guide uses those distinctions; the diagram is our own organizing aid, not a replacement for the document.

Make coverage visible

Inspection recordQuestion to answerReading route
CharacteristicWhich drawing requirement is being evaluated?Size, geometry and texture
CoverageWhich depths or regions were reached, and which remain unmeasured?Deep-hole measurement methods
Measurement resultWhat instrument, procedure and uncertainty information accompany it?Measurement uncertainty

For example, “diameter recorded near the accessible end” and “diameter requirement evaluated over the agreed depth” describe different evidence. That example contains no assumed tolerance or instrument capability. Record the actual positions and the basis for your sampling plan.

Keep inspection time and acquisition time separate

The Novacam turbo-shaft archive case reports both a complete inspection cycle and a shorter acquisition interval. Its reported sorting outcome concerns that inspection task. It is useful for reading a supplier’s timing claim; it does not set acceptance limits or a production yield target for another component.

Use the bore quality acceptance worksheet to connect requirements, coverage, method, results and disposition. Agree the applicable decision rule and responsibility before using the worksheet for a delivery. A filled worksheet organizes evidence; the responsible parties still need to review and approve the result.

The articles below address individual inspection questions. Start with the requirement you need to answer, then choose the method and supporting evidence for that requirement.

Choose your next step

A reading route through this topic

Choose the question you are working on. These links organize the library; they are not machine operating instructions.

  1. 01

    Define bore requirements

    Deep Hole Drilling Tolerances: Size, Geometry and Texture →
  2. 02

    Choose measurement methods

    Deep Hole Measurement Methods: Air, Contact and Optical →
  3. 03

    Review measurement uncertainty

    Deep Hole Measurement Uncertainty: A Worked Budget →
  4. 04

    Prepare first-article inspection

    Deep Hole Drilling First Article Inspection (FAI) Guide →
  5. 05

    Review process capability

    Deep Hole Drilling Process Capability and SPC →
  6. 06

    Review monitoring research

    AutoBohr Monitoring: What the Completion Report Establishes →

Principles & process routes

Problems, inspection & evidence

Setup, parameters & operating documentation