BTA Automation: Connect Part Handling to Inspection Records
Separate material-handling automation from demonstrated bore acceptance, and retain part identity across cell operations and inspection.
Separate material-handling automation from demonstrated bore acceptance, and retain part identity across cell operations and inspection.
Select a BTA drill tube by distinguishing hole diameter, tube OD and ID, then confirm the thread interface and documented inspection requirements.
Build a drawing-linked first-article report with traceable results, unmeasured regions, deviations and an explicit release decision.
Connect each required bore feature to its measurement programme, evaluated coverage and identifiable inspection result.